From Google Workspace
We assess Gmail, Drive, and Calendar for migration and confirm the supported data and conversion work in your written scope.
- Mail, including folders — Gmail labels become Outlook folders, and nested labels become nested folders.
- Calendars, including recurring events and the meeting rooms you have defined.
- Contacts, both personal and shared directory entries.
- Google Drive and Shared Drive files into OneDrive and SharePoint, with the folder structure preserved.
- Groups and distribution lists, rebuilt as Microsoft 365 groups or shared mailboxes.
- Google Docs, Sheets, and Slides convert to Word, Excel, and PowerPoint. Most convert cleanly; heavily scripted Sheets and complex Docs formatting need checking, and we flag those before the move.
- Apps Script automations need assessment and possible rebuilding as Azure workflows; rebuilds must be included in the written scope or approved separately.
- Google Vault holds and Chat history do not transfer; if you need them, keep the Workspace subscription for the retention period.
- 1We provision the Microsoft tenant and verify your domain while Google is still live and untouched.
- 2We run an initial mail and file sync and check the results before cutover.
- 3We switch the MX record on an agreed evening, then run a delta sync to pick up anything that arrived during the switch.
- 4Your team signs in to Outlook at the agreed cutover. Keep your Workspace subscription active until we have reviewed migration results and you approve closure.
We plan to retain Google mail access during the switch and reconcile messages received there. DNS propagation can take 24–48 hours or longer; source access, licensing, and sync results affect continuity. We agree the expected disruption after assessment.
- Your Google Workspace owner or super-admin to approve migration access and carry out setup through an approved secure method. Never send admin passwords or recovery codes through chat or request forms.
- Access to your DNS, or someone available to change one record while we are on the call.
- A list of shared drives and who should be able to reach each one.
- A decision on which Docs and Sheets are business-critical, so we test those conversions first.
